Reestablishing a High-functioning Equipment Maintenance Program at a Naval Shipyard

Acrobat PDF Icon Download Reestablishing a High-functioning Equipment Maintenance Program at a Naval Shipyard Success Story (PDF)

The Situation:

This Naval Shipyard includes large shops, graving docks, warehouses and heavy equipment required to perform major repairs and modernization of naval ships. The Shipyard’s heavy equipment includes power generators, welding machines, sandblast machinery, computer-driven machines, lathes and pipe benders. Some equipment is stationary within shops and some is portable. The Shipyard functions as a large job shop and seldom has reason to set up production lines for repeat manufacturing or repairs.

The Challenges:

During an organizational downsizing in 1996, the equipment maintenance shop was reduced by 70% without re-engineering the processes and management practices to assure that the shop would continue to function adequately. By 2005, after almost a decade of insufficient support and weak management practices, the remaining employees were frustrated and demoralized. The Shipyard equipment maintenance program had deteriorated to a non-functioning level. Equipment inventory was unknown, no PM’s were being performed by the maintenance shop, there was no process control or oversight, and equipment was being run to failure. There was no accurate accounting for equipment operational status or potential impact on future productivity.

The Approach:

In June 2006, Life Cycle Engineering (LCE) partnered with the Shipyard to accomplish the following over an 18 month period:

  • Process and structural re-engineering, guideline development and training
  • Inventory update for large shop and portable ship support machinery
  • Establishment of a technical library for heavy machinery manuals and drawings. The Shipyard continues to populate the library as they research and build maintenance plans for individual machines.
  • Improved planning and scheduling processes and utilization management practices
  • Implementation of kitting and other procurement and inventory processes
  • Establishment of training and initiation of Reliability Engineering

In order to help the Shipyard build a functional maintenance program from scratch, LCE was integrally involved in facilitating the development of new processes, and leading and training shipyard employees.

The Results:

Maintenance Shop productivity has improved significantly, as demonstrated by the following two examples:

  • When planning and scheduling processes were first restarted early in 2007, schedulers were only able to schedule 23% of the mechanics’ time. By the end of 2007, as old PM strategies (now updated) and new Equipment Maintenance Plans were implemented, this number had increased to 76%.
  • Utilization (wrench time) for the Maintenance Shop is estimated to have been less than 15% in 2005 and was estimated to be over 30% by the end of 2007.

At the end of the implementation project, utilization was increasing, maintenance plans were being implemented, an operator care program was being planned, and mid-managers were starting to respond to performance measures. Operating shops were starting to trust and contact the Maintenance Shop for maintenance needs as they reported seeing increased responsiveness and successful repairs. LCE’s breadth of service and integrated systems approach was critical in helping this Shipyard reestablish a high-functioning equipment maintenance program.